1 BOTC Design and construction of vegetable oil depot having a capacity of 10 million litres at Apapa Wharves 1980
2 LBN (UNILEVER) Construction of Sulfonation Plants at Apapa & Aba 1980
3 NESTLE Construction of Baby Food factory at Agbara 1981
4 GUINNESS New Depot at the Ogba Factory 1981
5 TOTAL Construction of an Asphalt Plant at Koko 1982
6 LBN (UNILEVER) Construction of a Detergent Plant at Aba 1983
7 LBN (UNILIVER) Construction of a vegetable oil Depot having a capacity of 5 million litres at Tin Can Island 1983
8 TOTAL Construction of a Lube Oil Depot having a capacity of 2000 tonnes at Koko 1984
9 TOTAL Construction of a 10” Bitumen Pipeline 1.5km long including a heating system at Koko 1984
10 GLOBAL SOAP Construction of a Detergent Plant with the capacity of 5 tons per hour at Ilorin 1985
11 NASCO Construction of a vegetable oil Depot having a capacity of 2.5 million litres at Apapa 1985
12 GLOBAL SOAP Extension of the Detergent Plant at Ilorin 1986
13 TOTAL Fire Hydrant System at the Apapa depot 1986
14 TOTAL Construction of a new Aerosol Plant at Apapa 1987
15 TOTAL Construction of an LPG Plant at Apapa 1987
16 POLY PRODUCTS Construction of factory buildings at Sango-Ota 1987
17 LBN (UNILEVER) Extension of the Detergent Plant at Apapa 1987
18 GLOBAL SOAP Further extension of the Detergent Plant at Ilorin 1988
19 TOTAL New Aviation depot, including storage tanks, pipelines and a fire hydrant system at Port Harcourt International Airport 1988
20 TOTAL New Aviation depot, including storage tanks, Pipelines and fire hydrant system at NAF Base, Makurdi 1988
21 NASCO Vegetable oil Depot with 1 million litres capacity at Jos 1989
22 TOTAL Construction of LPFO storage facilities at the Hong Kong Synthetics site at Sango-Ota 1989
23 LBN (UNILEVER) Construction of the Lipton Tea factory at Agbara 1989
24 SPI Construction for Shongai Packaging Industries Ltd of new factory buildings at Sango-Ota 1989
25 TOTAL Construction of a new LPG plant, including storage tanks, pipework and a fire hydrant at Uyo. 1989
26 TOTAL Extension of Lube Oil Plant at Koko 1989
27 GLOBAL SOAP Construction of a new Sulfonation Plant to produce 24 tons of Sulphonic Acid at Ilorin 1989
28 UNIPETROL New Fire Fighting System at the Apapa Depot 1989
29 TOTAL New Fire Fighting System for the LPG plant at Ilorin 1989
30 TOTAL Construction of the LPG plant at Ibadan 1990
31 TOTAL Construction of the LPG plant at Benin 1990
32 UNIPETROL Repairs of 8 million litres capacity bulk storage tank and installation of a sprinkler system at Apapa 1990
33 UNIPETROL Refurbishment of 3.3 million litres capacity bulk storage tank and installation of a sprinkler system at Apapa 1990
34 UNIPETROL Nigerian Navy Petroleum Depot at Apapa 1991
35 TOTAL Construction of the Maiduguri LPG Plant 1991
36 LBN (UNILEVER) Extension of the Soaps factory at Apapa 1992
37 LBN (UNILEVER) Underpinning of the foundations of the sulfonation plant at Aba 1992
38 WAPCO (LAFARGE) Construction of a new 3,000hp Cement Mill at Ewekoro Works 1993
39 WAPCO (LAFARGE) Rehabilitation of clinker conveyors, slurry wash mill, apron feeder and limestone crushers at Ewekoro Works 1993
40 NESTLE Fabrication and erection of a spent grains recovery System, including steel silos at Agbara 1994
41 P&G Erection of a new factory to produce Pampers at Ibadan 1994
42 NESTLE Construction of the Malt extraction plant extension at Agbara 1995
43 WAPCO (LAFARGE) Installation of 800 KVA Rolls Royce Generator at  WAPCO’s Head Office in Ikeja 1995
44 WAPCO (LAFARGE) Design and construction of the Kiln dust recycling Factory, to produce Calcium Sulfate at the rate of 90,000 tons per annum at Shagamu Works 1995
45 UAC Construction of a new LPG plant at Agbara 1995
46 CISCO Construction of a Limestone storage shed at Ogba 1995
47 CISCO Construction of a new warehouse and gantry crane at Ogba 1995
48 DUNLOP Construction of a fuel storage Depot, 600,000 litres capacity at the Ikeja factory 1995
49 LBN (UNILEVER) Fabrication and erection of the Lye Treatment Plant at Apapa 1995
50 NOLCHEM Extension of Petroleum Storage Depot, 3 million litres for AGO, and 2 million litres for PMS at the Apapa Depot 1996
51 BRISCOE Fabrication and erection of 60 metres high Masts for Radio Telecommunications at Ikoyi & Ikeja 1996
52 LSWC (Jointly with Zakhem International) Rehabilitation of Iju Water Works, including the fabrication and Installation of Horizontal Flow sedimentation tank equipment, Flocculator, Clarifier equipment, Decanting Troughs, and Surge vessels at Iju, Lagos State. 1997
53 LBN (UNILEVER) Procurement, fabrication and installation of Stainless Steel Coils made from type 316 Stainless Steel and   welded using GTAW (TIG) process as specified for hygienic welding in the food industry at Apapa. 1997
54 NB (HEINEKEN) Design, procurement, fabrication and installation of 6 nos Air Blowers, each powered by an electric motor and designed to generate 10m3 of air/sec at a pressure of 1500 pa at Enugu Brewery. 1997
55 LBN (UNILEVER) Procurement, fabrication and installation of factory pipelines for edible oils at Agbara. The pipelines were made from type 316 Stainless Steel and welded using GTAW (TIG) process as specified for hygienic  welding in the food industry. 1998
56 NB (HEINEKEN) Design, procurement, fabrication and erection of the sorghum malting plant at Enugu. The project included 2 nos. 85 tons storage silos, 2 nos. 5 tons loading bins12m long Redler chain conveyor, ancillary pipelines and pneumatic valves. 1998
57 NB (HEINEKEN) Rehabilitation and reconstruction of 16 nos. sorghum storage silos at Iganmu. Each silo is 2.40m x 2.40m x 33.00m high having a total capacity of 3000 tons. The work involved the replacement of corroded silo pressed metal sheets, shot-blasting and coating with anti-corrosive Epoxy coatings. 1998
58 NB (HEINEKEN) Design, procurement and fabrication of a water treatment plant, based on the Diffused Air System to reduce iron content from 1.1ppm to 0.1ppm. The plant is fitted with a 7 kw Air Blower designed and fabricated by our company. The system is designed to treat 1440m3 of borehole water per day. 1998
59 PPMC Usuma River Pipeline Crossing. The project involved welding by our coded welders of 16” diameter pipeline 1 km long. Joints were 100% radiography tested. (The project was carried out jointly with ZAKHEM INTERNATIONAL) 1998
60 PPMC Dismantling of floating roof tank No. 13 at Mosimi Depot. The tank is 44m diameter and the project  involved cutting under strict fire safety precautions of 175 tons of steel. 1998
61 LBN (UNILEVER) Rehabilitation and repair work carried out on a 20 tons jacketed stainless steel Compounding Kettle used for the blending of Petroleum Jelly at Oregun. 1998
62 UNION BANK OF NIG. Design and construction of two glass fibre Reinforced polyester basins for decorative water fountains at UBN Stallion Plaza, Marina. 1998
63 LBN (UNILEVER) Procurement, fabrication and installation of a Stainless steel pipeline for edible oils at Agbara Pipes were made from 316 stainless steel and welded using GTAW (TIG) process 1998
64 LBN (UNILEVER) Shot-blasting and lining of two 20 tonnes capacity Carbon steel vessels using food quality Epoxy inner coatings. 1999
65 LBN (UNILEVER) Rehabilitation of the existing water treatment plant  at Oregun. We designed the Cascading Water system and Contra Air Flow. Air under pressure was induced by 4 nos. 2 KVA air blowers. The system is designed to reduce the iron content of borehole water to less than 0.1ppm. The Rehabilitated plant will treat 1,440m3 of borehole water per day. 1999
66 LBN (UNILEVER) Design and construction of stainless steel vessels 2,000 litres capacity for use in the manufacture of Close-Up toothpaste at Oregun. The stainless steel vessels were made from type 316 stainless steel, welded using GTAW (TIG) process. 1999
67 GUINNESS Dismantling of large brewery vats (4,100mm diameter x 9,500mm high) at the Ikeja brewery, Transporting and erecting them at Benin brewery. 1999
68 MOTOPHONE Fabrication and installation of telecommunication Towers for a GSM telephone system in Lagos and Abuja. 1999
69 AIR FORCE BASE CAMP Revamping and reconstruction of a SATEC watertreatment plant model MD, two Rapid Sand Filters and a Chlorination plant. The project was designed to provide potable water to a community of 5,000 residents at the rate of 750,000 litres per day in Makurdi. 1999
70 PROVAST LTD Redecoration of two blocks of 36 flats for Shell at No. 10, Second Avenue, Ikoyi – Lagos 2000
71 DUMEZ Design, fabrication, shot-blasting and coating with Epoxy of 7 nos. horizontal cylindrical tanks for the storage of petroleum products in Abuja. 2000
72 UNILEVER Construction of Unilever’s New Soaps factory at Agbara. The project included the installation of equipments, some fabricated by us, others imported from overseas. It also included all pipework, including stainless steel pipework. 2001
73 P.W. (NIG) LTD Design and construction of the Murtala Mohammed International Airport toll gate’s steel structure 2001
74 PZ INDUSTRIES Structural steelwork for the Liquid Filling Platform and Packing Hall at Ikorodu. 2001
75 THIS DAY GROUP Design, fabrication and installation of the new Press Building in Abuja. 2001
76 CAPPA & D’ALBERTO Fabrication of structural steel work for a warehouse at Apapa and for a residential building at Ikoyi 2002
77 NB (HEINEKEN) Installation of equipments, erection and welding of the water treatment plant’s pipework for CHRIST HOLLAND on behalf of HEINEKEN in Ibadan. 2002
78 FLOUR MILLS OF NIG PLC Design, fabrication and installation of surge tank and air receivers, 14,000 litres of AGO storage tank and 4 nos. 100 tons bran silos at the Apapa Mill. 2002
79 ENERGO NIG Design and fabrication of three horizontal AGO storage Tanks for British American Tobacco factory in Ibadan 2002
80 METALUM LTD Fabrication and installation of steel structures for Long Span aluminium Roof Lights at Zenith Bank Victoria Island 2003
81 KLIF CONSULTANTS Fabrication and installation of steel catwalk and steel supports for bookshelves over the restaurant and buffet areas at Protea Hotel, Lekki. 2003
82 KLIF CONSULTANTS Fabrication and installation of steel structure for the CONSULTANTS main entrance canopy of A. S. L. at Murtala Mohammed Airport, Ikeja. 2003
83 SIEMENS Design, procurement and fabrication of 250,000 litres AGO storage Depot at SHESTCO Abuja 2003
84 PRESCO PLC Construction of buildings extension of sterilizer shed steelwork at Benin factory and the fabrication of 2 nos. 510m3 elevated water Storage tanks for the Gabon factory 2004
85 P.W. (NIG) LTD Design and fabrication of 2 km of steel decorative fencing for Trojan Estate, Lekki 2004
86 FLOUR MILLS OF NIG PLC Construction of 1,379,000 litres AGO vertical storage tank at the Apapa Mill 2004
87 PROSAFE (NIG) LTD Survey and tests carried out on 5 nos. platform cranes at offshore of Calabar 2004
88 WAPCO (LAFARGE) Refurbishment during shut-down of Cement Plant at Ewekoro factory 2004
89 DELI FOODS (NIG) LTD Construction of three flour silos at the Oshodi biscuit  factory 2004
90 THE SUN PUBLICATION LTD Construction of the Newsline infrastructure for 2 news press at Apapa 2004
91 NIGERIAN BOTTLING CO. PLC Installation, welding and insulation of the new CO2 plant at the Coca Cola Ikeja factory 2004
92 NB (HEINEKEN) Refurbishment of Silos and other maintenance work at the Aba factory 2004
93 NUTRICIMA LTD Construction of pipework and installation of equipments For the new Milk processing factory at Ikorodu 2004
94 PRESCO PLC Design, fabrication and erection of 70m and 40m high Communication masts at Obaretin near Benin 2005
95 NB (HEINEKEN) Design, fabrication and erection of civil and structural work for the extension of grain silos to accomodate  Kunzel Dust control plant at Iganmu brewery 2005
96 PZ INDUSTRIES Civil, Mechanical and Electrical works in the MINTA Skid upgrade project at Ikorodu 2005
97 SMALL AND MEDIUM ENTERPRISES DEVELOPMENT AGENCY In partnership with KLIF CONSULTANTS, we  carried out the Town Planning design and bankable feasibility study for a new industrial city to accommodate 74 new industries, at IDC Yola Site, Adamawa State 2005
98 FLOUR MILLS OF NIG PLC Design, fabrication and erection of 2 new Diesel storage Depot at Apapa - Gallery Link 2005
99 WAPCO (LAFARGE) Upgrading of raw materials transportation system by the installation of a new conveyors and lifts at the Ewekoro Works 2005
100 NUTRICIMA LTD Fabrication and erection of 2 Nos. Diesel and Oil tanks and the construction of a stainless steel pipeline for the water treatment system 2005
101 UNICEM NIG LTD Design, fabrication and erection of a 4-storey industrial building, including foundations, structural, civil and electrical works for a new cement packing plant in Calabar – Gallery Link 2005
102 METHODIST BOYS HIGH SCHOOL Design and construction of a large span steel roof BOYS HIGH  20m x 30m for the school’s Centenary Hall in Victoria Island – Gallery Link 2006
103 PZ INDUSTRIES Upgrade of the Minta Skid and PVC ceiling extension at Ikorodu 2006
104 AP PLC Construction of 1 million litres ATK storage tank and Water Hydrant facility at AP’s aviation depot in Ikeja 2007
105 DANGOTE INDUSTRIES LTD Erection of Structural Steel, Accessories and Deck plates at Dangote Flour Mills in Ilorin – Gallery Link 2007
106 DANGOTE INDUSTRIES LTD Fabrication and Erection of mechanical equipments at Obajana Cement factory 2007
107 PRESCO PLC Erection of a new VYNCKE Boiler, 30 tonnes of steam per hour and installation of accessories and pipework at Obaretin, near Benin – Gallery Link 2007
108 FLOUR MILLS OF NIG PLC Erection of Steelwork for the New West Silos Grain storage facilities at Apapa Mill – Gallery Link 2007
109 P.W. (NIG) LTD Fabrication and Erection of a new Canopy Building at Chevron site, Agura 2007
110 THE SUN PUBLICATION LTD Construction of the reinforced concrete foundations and infrastructures for the New Press at Kirikiri 2007
111 OKOMU OIL PALM PLC Design, fabrication and erection of a new Rubber factory, including a steel building 132m long x 36m span at Okomu, Edo State – Gallery Link 2007
112 HARRIER PROPERTIES LTD Construction of 4 nos. semi detached houses with a swimming pool including all the civil, electrical, plumbing, ceiling, painting and landscaping in Osborne Phase 1 Ikoyi 2007
113 BENUE CEMENT COMPANY PLC Fabrication of Cement Ducts and Structural Steel at  BCC in Gboko, Benue State 2008
114 FLOUR MILLS OF NIG PLC Design, procure, and erect one 522,000 litres Diesel storage tank and one Water storage tank at their flour mill in Calabar 2008
115 FLOUR MILLS OF NIG PLC Procure, fabricate and erect steel structures to carry the Buhler Machinery at Niger Mill, Calabar 2008
116 FLOUR MILLS OF NIG PLC Refurbishment of 8 nos. wheat silos at the Apapa Mill 2008
117 ASHAKA CEMENT PLC Cement Mills Filter Refurbishment and Installation of cement Dust Precipitators at Ashaka, Gombe State 2008
118 FLOUR MILLS OF NIG PLC Erection of 7 nos Semovita Silos and Supporting Steel Structures (500 tonnes of steel) at Apapa Flour Mills 2008
119 TULIP COCOA PROCESSING LTD Fabrication of Steel Structure and Erection of Industrial Doors, Ceilings, Canopies and Roofs 2008
120 P.W. (NIG) LTD Steel fabrication and erection of Warehouses and Watch Towers at Army Depot at Yaba, Lagos 2009
121 NIGERIAN BEWERIES PLC Fabrication and erection of Pasteurizer cooling towers for Ibadan and Kaduna Breweries 2009
122 P.W. (NIG) LTD Fabrication and erection of Terminal Building steel structures at Ikorodu Jetty, Lagos 2009
123 KLIF CONSULTANTS Fabrication and Installation of Entrance Arches and gates for Rainbow College, Ogun State 2009
124 RAINBOW COLLEGE Fabrication and Installation of Steel Book Shelves 2009
125 APM TERMINALS Refurbishment of STS cranes at Apapa Wharf 2010
126 MORPOL ENGG SERVICES Replacement of 600mm Water Pipeline under Eko Bridge and at Costain Area, Lagos 2010
127 METALUM LTD Fabrication and Installation of Steel structures to support Aluminium Curtain walls and scenic lifts in Victoria Island, Lagos 2010
128 ZENITH BANK PLC Construction and Installation of 45,000 litres Diesel Tank at Victoria Island, Lagos 2010
129 P.W. (NIG) LTD 4 kilometers long Belt Conveyors for LAFARGE  to carry limestone and shale from the quarry to LAFARGE’s Cement Mill, at Ewekoro. – Gallery Link 2011
130 FRIESLAND WAMCO NIG. PLC Flood Protection Buttresses for Friesland Factory,  PLC   at Ikeja 2011
131 VACC TECHNICAL LTD Fuel Storage and Supply System for Shoprite Malls, at Ikeja and Abuja – Gallery Link 2011
132 FLOUR MILLS OF NIG PLC Dismantling and Replacement of Bran Silos, Fabrication and Installation of offals Bin Base cones at Apapa 2011
133 TULIP COCOA PROCESSING LTD Rehabilitation and Expansion of Cocoa Processing  Factory, including a new Warehouse, a new Powerhouse and revamping of existing Buildings and roads, at Ijebu–Mushin – Gallery Link 2011
134 ENERGO NIG. LTD Fuel Storage and Supply System, at Uyo 2011
135 LOTUS (ALUCAN) Fuel Storage and Supply System, at Agbara 2011
136 FLOUR MILLS OF NIG PLC Fuel Storage and Supply System for  Sugar Plantations at Sunti Farms 2011
137 HEINEKEN Upgrading and Cladding of CO2 Cracking Plant,  Milling House, Power House, Silo House, Empty and Full Bottles Warehouses at Ota Factory 2012
138 HEINEKEN Maintenance work and Refurbishment of eight  2012 Buildings at Ota Brewery 2012
139 FLOUR MILLS OF NIG PLC Fabrication and Installation of Canopy with Aluminium Roofing over Weighbridges at West Flour Mill, Apapa 2013
140 FLOUR MILLS OF NIG PLC Fabrication, Insulation and Cladding of Vegetable Oil steam-heated tanks for ROM Ibadan 2013
141 FRUIT AND NUTTY NIG. LTD Fabrication of mild steel high pressure Vessels of Various capacities for their new factory at Agbara 2013
142 FRUIT AND NUTTY NIG. LTD Fabrication of insulated steel Hot well and Cold well tanks and Boiler feedwater tanks for their new factory   LTD   at Agbara 2013
143 TULIP COCOA PROCESSING LTD Construction of Reinforced Concrete Foundations for  Conveyor Belts, Dryer, Boiler House  and load bearing Slab for Heat Exchangers in Ijebu – Mushin 2013
144 METALUM LTD Fabrication and Installation of Steel Structure for a new Canopy at Millennium Tower 2013